SMSC USB2507 Manual do Utilizador Página 38

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 44
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 37
Integrated USB 2.0 Compatible 7-Port Hub
Datasheet
Revision 2.3 (08-27-07) 38 SMSC USB2507
DATASHEET
Chapter 6 XNOR Test
XNOR continuity tests all signal pins on the Hub (every pin except for NC, XTAL1/CLKIN, XTAL2,
ATEST/REG_EN, RBIAS, TEST1, Power, and Ground). This functionality is enabled by driving TEST1
and CFG_SEL[1] high, driving SCLK low and transition RESET_N from low to high. The output from
the XNOR chain is driven to GR2 . For each pin tested for continuity GR2 should toggle.
Vista de página 37
1 2 ... 33 34 35 36 37 38 39 40 41 42 43 44

Comentários a estes Manuais

Sem comentários